Cost overrun

Also called: budget overrun, construction contingency

Defined by the Research desk, The Lender Report · Sources reviewed

The amount by which a construction project costs more than its budget, which the borrower is normally expected to cover.

A lender sizes a construction loan to a budget. If the job costs more, the loan does not grow on its own, and the gap has to be filled before the building can be finished.

The OCC handbook says a budget typically includes a contingency account for unexpected overruns, and that these allowances usually range between 5 and 10 percent of the overall budget. It separates true surprises from poor estimating: overruns that come from poor projections would ordinarily be covered by the borrower, not by drawing down the contingency line in the loan.

Example: on a $4,000,000 budget, a contingency in that range is $200,000 to $400,000.

Lenders look for the things that limit the exposure: a fixed-price construction contract, a contractor with a record on similar jobs, borrower cash equity that goes in first, and a guarantor with verified liquidity. Renovation jobs get extra attention because hidden conditions show up only after work starts.

How it shows up in the data here

Overruns happen inside individual projects, and no public file tracks them. Bank call reports show the construction and land balance a bank held on the report date, nothing about budgets. Lenders with construction on their books are at construction lenders. To test how a higher cost changes your loan-to-cost, use the LTV and LTC calculator. No lender's contingency rule is in the data here.

Go further

Related terms

Sources

  1. OCC Comptroller's Handbook, Commercial Real Estate Lending, Version 2.0 (March 2022), pages 11, 31, 32 and 46, retrieved .

Plain definitions for orientation, not legal, tax or credit advice. A lender's own policy decides what it will do.